The Stage Two Proposed Scheme Consultation was carried out from 14th May 2016 to 30th July 2016.

Over the eleven weeks of consultation, over 3,000 visited 34 consultation events and NuGen’s exhibition at the Whitehaven Civic Hall, finding out more about the Moorside Project and leaving over 1,000 written responses.

Below are all the documents relating to the Stage Two Consultation.

Proposed Scheme Overview (2016)

A summary of the Proposed Scheme document.

Proposed Scheme (2016)

The main Stage Two Consultation document, outlining NuGen’s ‘Proposed Scheme’.

Feedback Form (2016)

The document provides an opportunity to respond to NuGen with your views on the Stage Two Proposed Scheme Consultation.

Newsletter (2016)

A summary of the proposed Moorside Project.

Non-Technical Summary of the Preliminary Environmental Information Report (2016)

A non-technical summary of environmental information which has been gathered into the Preliminary Environmental Information Report by NuGen, so far to enable preliminary identification and assessment of the likely significant environmental effects of the Moorside Project.

Technical Folder

Preliminary Environmental Information Report (2016)

This document presents full details of the environmental information which has been gathered by NuGen so far to allow preliminary identification and assessment of the likely significant environmental effects of the Moorside Project.

Habitats Regulations Assessment Evidence Plan (2016)

The HRA Evidence plan details the information that NuGen anticipates will be necessary to inform the Habitats Regulations Assessment (HRA) process and gives an outline of the further steps needed to determine any likely significant effects on the wider designated sites under the Habitats Directive.

Draft Outline Construction Environment Management Plan (2016)

The Draft Outline CEMP provides the outline structure of how environmental issues during the construction period will be managed on site.

Draft Outline Biodiversity Management Strategy (2016)

This is the NuGen strategy which outlines how it intends to think about ecological and biodiversity management for the Moorside Project.

Draft Transport Strategy (2016)

Sets out NuGen’s strategy for transporting workers, goods and materials during the construction and operation of the project.

Plans and Drawings (2016)

Provides drawings and plans which illustrate and support the content of the Stage Two Consultation documents.

Notice of Proposed Application under s48 Planning Act 2008 (2016)

Formal notice advertising the project and the consultation in national and local publications.

Draft Property Support Scheme and Draft Local Mitigation Scheme (2016)

Draft proposals for NuGen’s voluntary scheme to assist residents owners within a defined area close to the Moorside Power Station.

Interim Consultation Report (May 2016)

Statement of Community Consultation (April 2016)